From the plant floor
Plant Maintenance Case Studies & Cost Savings
Practical problems, what caused them, and what to check next. Notes from everyday maintenance work on steam systems, utilities and production equipment.
Latest case study
Boilers & steam systems
Boiler Burner Start-Up Sequence: What Happens Before the Flame Lights
Purge, damper check, gas valve leak test, ignition, flame proving and pressure control, with the safeties that lock the burner out and where to look when it stops. From a real panel upgrade.
Read the case study →