Maintenance KPI Calculator – PM Compliance, Planned Work and Backlog

Calculate PM compliance, planned work percentage and backlog in weeks of work.

READY FOR YOUR DATA

Enter your values, then select Calculate.

Formula & assumptions

PM compliance (%) = PM tasks completed on time / PM tasks scheduled × 100. Planned work (%) = planned maintenance hours / total maintenance hours × 100. Backlog (weeks) = open backlog hours / weekly planned labour capacity.

Agree the definition before comparing sites or months. On time usually means within an allowed window around the due date, and the policy for rescheduled or cancelled tasks must be written down. Use the same hours basis for planned and total hours, and the same period for tasks. Backlog normally counts approved, ready-to-schedule work and excludes emergency work. These figures are management indicators, not a measure of maintenance quality.

Method: standard dimensional arithmetic; equation and input units shown above.

Calculation reviewed: 14 October 2026 · Engineering Desk Tools · How we check calculations

This maintenance KPI calculator works out three key indicators from your work order data: PM compliance, planned work percentage and backlog in weeks. Together they show whether the maintenance team is in control or reacting to breakdowns.

Maintenance KPI formulas

PM compliance (%) = PM tasks completed on time ÷ PM tasks scheduled × 100

Planned work (%) = planned maintenance hours ÷ total maintenance hours × 100

Backlog (weeks) = open backlog hours ÷ weekly labour capacity

Worked example

In one month the team scheduled 120 PM tasks and finished 105 within the allowed window: PM compliance = 87.5 %. Out of 1,600 maintenance hours, 1,150 were planned: planned work = 71.9 %. The open backlog is 900 hours and the team has 360 planned hours a week: backlog = 2.5 weeks.

Main maintenance KPIs and typical targets

Targets often used in industry as a starting point. Set your own based on your plant and track the trend.
KPIFormulaCommon target
PM compliancePMs done on time ÷ PMs scheduled90 % or more
Planned workPlanned hours ÷ total hours80–90 %
Emergency / reactive workEmergency hours ÷ total hoursBelow 10–15 %
Schedule complianceScheduled hours worked ÷ hours scheduled85–90 % or more
BacklogReady backlog hours ÷ weekly capacity2–4 weeks
MTBFOperating time ÷ number of failuresRising trend
MTTRRepair time ÷ number of repairsFalling trend
OEEAvailability × performance × qualityRising trend; world-class often quoted as 85 %

Use the MTBF calculator and the OEE calculator for the reliability and production KPIs.

Defining the KPIs clearly

How to use the maintenance KPI calculator

Enter the PM tasks scheduled and completed on time in the period, the planned and total maintenance hours, the open backlog in labour hours and the weekly planned labour capacity. Select Calculate to see the three KPIs. A free preventive maintenance Excel template helps you collect the data.

Frequently asked questions

How do you calculate PM compliance?

Divide the number of PM tasks completed on time by the number scheduled in the period, then multiply by 100. 95 done on time out of 100 scheduled is 95 %.

What is a good PM compliance?

Many plants aim for 90 % or more. Below about 80 %, missed PMs usually start to show up as breakdowns.

How do you calculate maintenance backlog?

Add up the estimated labour hours of approved, ready work orders and divide by the planned labour hours available per week. 2 to 4 weeks is a common healthy range.

What are the most important maintenance KPIs?

PM compliance, planned work percentage, schedule compliance, backlog, MTBF, MTTR and OEE are the most widely used.

What is planned vs unplanned maintenance percentage?

Planned work percentage is planned hours divided by total maintenance hours. The rest is unplanned or reactive work. Well-run plants often reach 80 % planned or more.

Related tools and records

Use related calculations with consistent units, periods and equipment scope.